Menu
  • Italian
  • English
TECNOPOLIS, engineering company from Bologna, is specialized in the design of management, commercial, industrial and logistics facilities.

IREN waste to energy plant

Parma

New Parma waste to energy plant

The Parma waste to energy plant is located within the PAI, Integrated Environmental Hub, the set of organized facilities for the disposal of non-hazardous urban and special waste in the province of Parma.

 

Tecnopolis has managed the procedures necessary to obtain the seismic and building permissions and engineered the final architectural and structural design of all the buildings, combining the specific plant requests with the civil design. Tecnopolis developed every necessary assistance to integrate the executive project.

 

The buildings with a reinforced concrete structure, such as the 70 meter high chimney made with sliding formworks, and the metal structures up to 40 meters high, are both of these particularly relevant.

Client: IREN S.p.A.
Project started in: 2010
End of works: 2013
Totale area: sqm 40.000